INVESTING INFLOW AND INFILTRATION REDUCTION

IN

PROJECT AREA

Blue River Central Area 1 Project

Field Crews Working May 2015 - September 2015

YOUR INVESTMENTS AT WORK

INFLOW AND INFILTRATION REDUCTION Blue River Central Area 1 Project

WHAT?

WHO?

• Important field investigations of the sanitary collection system in your area.

• KC Water Services assisted by Tetra Tech, EAE Inc., Schmitz King and Associates, and SE3.

WHAT TO EXPECT? • Various field crews inspecting manholes and cleaning the public sewer lines.

• Smoke from smoke testing activities.

WHY? • Investigate the existing sewers to determine locations of needed sewer repairs.

• Reduce risk and frequency of sanitary overflows and basement backups.

• Rehabilitate the aging sewer system. • Meet regulatory requirements as part

WHERE?

• Temporary street closures.

The project is located in Kansas City, Missouri within the following boundaries:

• Public meeting will be held to inform

• Northern boundary: 67th Street • Southern boundary: 87th Street • Eastern boundary: Blue Ridge Blvd. • Western boundary: Blue River

property owners about the field investigations and project schedule.

• Crews will knock on your door if they need to inspect the sewer or manholes on your property.

• Crews will not ask to enter your home or building.

of KC’s Overflow Control Program.

IMPROVEMENTS? • Current activity includes identifying

WHEN? • Field investigations will be ongoing

needed sewer rehabilitation repairs.

May 2015 through September 2015.

• Design professional services will be conducted from February 2015 through October 2016.

• Construction will occur between October 2016 and November 2017.

CONTRACT AMOUNT Design professional services contract includes all services rendered through the construction phase of the project.

• $585,000

QUESTIONS? Specific questions about this project can be directed to: • Alex Ivanescu, Project Manager, KC Water Services, 816-513-0445 or [email protected] • Michael Odrowski, Project Manager, Tetra Tech, 816-412-1741 or [email protected]