LEED 2009 for Neighborhood Development SLL CREDIT 1: PREFERRED LOCATIONS Stage 3: LEED-ND Certified Neighborhood
All fields and uploads are required unless otherwise noted.
ALL PROJECTS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Select one of the following:
Connections Tool
Stage 3A. No change since Stage 2 Stage 3B. Change since Stage 2 Stage 3C. Did not submit at Stage 2
STAGE 3A No change has been made since submittals in previous stages that would affect credit compliance. SLL Credit 1: Preferred Locations Stage 2 Points Documented:
of 10
The project earned an exemplary performance point at Stage 2.
STAGE 3B Provide updated versions of the items submitted at the previous stage.
STAGE 3C Select all that apply: Option 1. Location Type Option 2. Connectivity Option 3. Designated High-Priority Location
LOCATION TYPE The project team has completed PI Form 1, "Infill Determination" section, and the site is determined to be infill. The project team has completed PI Form 1, "Previously Developed Site Determination" section, and the site is determined to be previously developed. The project team has completed PI Form 1, "Adjacent Site Determination" section, and the site is determined to be adjacent.
LEED 2009 for Neighborhood Development SLL Credit 1: Preferred Locations Form Version 1.0
CONNECTIVITY Upload SLLc1-1. The project team has uploaded a map with vicinity base, project boundary, any excluded land area, and intersections within 1/2-mile of project boundary. Exclude intersections within the project boundary that were constructed or funded by the developer within the past 10 years. From Upload SLLc1-1: Land area within 1/2-mile of project boundary (may include the project land area):
sq mi
Number of eligible intersections within 1/2-mile of project boundary: Eligible intersections/sq mi within 1/2-mi of project boundary:
DESIGNATED HIGH-PRIORITY LOCATION NPD Credit 4: Mixed-Income Diverse Communities, Option 2, Stage 3 Points Documented: Note: Information highlighted in yellow below must be consistent with SLL Credit 2: Brownfields Redevelopment, if attempted.
Upload SLLc1-2. The project team has uploaded a map of the priority area boundary in relation to the project boundary for each checked priority area. (This may be a special non-base map.) Priority areas in which project is located include: (Select all that apply) EPA National Priorities List Federal Empowerment Zone Federal Enterprise Community Federal Renewal Community Department of Justice Weed and Seed Strategy Community Department of the Treasury Community Development Financial Institutions Fund Qualified Low-Income Community U.S. Department of Housing and Urban Development's (HUD) Qualified Census Tracts U.S. Department of Housing and Urban Development's (HUD) Difficult Development Areas (DDA) SLL Credit 1: Preferred Locations, Option 3 Points Documented:
LEED 2009 for Neighborhood Development SLL Credit 1: Preferred Locations Form Version 1.0
ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form. Upload SLLc1-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)