Metropolitan Park - Phase 4/5

VORNADO CHARLES E. SM I T H

Planning Commission July 1, 2013

Project Team • Vornado/Charles E. Smith – Owner Developer • Torti Gallas Urban – Design Architect / Architect of Record • Maurice Walters Architect – Design Architect • Studio39 – Landscape Architect • MV+A – Retail Architect • VIKA – Civil Engineer • Metropolitan Engineering – MEP Engineer • Gorove Slade + Associates – Traffic Engineer • Venable – Zoning Attorney 2

Community Process •

09/25/2012 - 4.1 Site Plan Acceptance



10/02/2012 - Mailed Letters to Community Groups



10/10/2012 - Bella Vista Representatives



10/11/2012 - Aurora Highlands Civic Association Representative



11/12/2012 - Arlington Ridge Civic Association Representatives



11/13/2012 - Crystal City Representatives



11/15/2012 - Bennington Tenant Representative



11/20/2012 - SPRC #1



01/10/2013 - Transportation Commission: Information Item



01/24/2013 - SPRC #2



02/14/2013 - SPRC #3



03/11/2013 - SPRC #4



04/01/2013 - SPRC #5



04/18/2013 - SPRC #6



05/02/2013 - Transportation Commission: Request to Advertise



06/15/2013 - Board Hearing: Request to Advertise



06/27/2013 - Transportation Commission: Action Item



07/01/2013 - Planning Commission



07/13/2013 - County Board Hearing (Scheduled)

3

Pentagon City Metro Station Area

4

Transportation Context Transit Facilities

Legend − Bus Stop within ¼-mile

Long Bridge Park

M

− Metro Station

VRE

− VRE Station

metro

Pentagon City

*

− Proposed Streetcar Stop − Capital Bikeshare Station Virginia Highlands Park

*

Crystal Drive

Crystal City

23rd Street

− Proposed Capital Bikeshare with PenPlace − Proposed Columbia Pike Streetcar Alignment − Proposed Crystal City Streetcar Alignment − Site Boundary

5

Transportation Context Vehicular Access

l

I

~

j

I

.

., l

I

J

,.J

•• • l

~

1111 ""' I

*'u"''

,,..,..,.,t,Jo\:f>

·-l«l~ ----

I

·

. ... ... ~

.-·

I

•I

\

....

·--'

I

'

!

~

...•.,...,,

t

••

I

'• l !

••

(

*

~

~

6

Project Area Bennington

Acadia (Under Construction)

Met Park 4/5 Site

Costco

Bella Vista Meridian

Millennium

Embassy Suites

Future Phase 6

Future Phase 7

The Americana Hotel The Hampton

Gramercy

Future Phase 8

7

N

Existing Conditions

View of Met Park 4/5 Site from the Gramercy

8

Existing Conditions

View of Met Park 4/5 Site from NorthWest on 12th Street

9

Existing Conditions

View of Met Park 4/5 Site from NorthEast, across S. Eads Street.

10

Existing Conditions Context

View of Surrounding Context from North East Corner of Met Park 4/5, along S. Eads Street.

11

12th Street Context Existing

South Hayes Street

12th Street

12

12th Street Context Planned

South Hayes Street

12th Street

13

Design Guidelines Metropolitan Park

Design Guidelines Site Plan

Existing, Approved & Proposed

348 Units

425 Units

411 Units (Approved) 699 Units (Proposed)

386 Units (734 Total Units) 341 Units (Proposed)

300 Units (Built)

285 Units

520 Units 342 Units (Proposed)

393 Units

359 Units (Proposed)

400 Units

455 Units

399 Units (Built) 361 Units (Proposed)

Total: 3,212 Units

Total: 3,212 Units

14

Design Guidelines Phase 4 & 5

R

P R

Design Guidelines  



P

3 Parking Entrances 2 Loading Docks ◦ 1 Residential/Retail Loading Dock ◦ 1 Residential Only Loading Dock 3 Residential Lobbies

R

Proposed Design  



P

1 Parking Entrance 2 Loading Docks ◦ 1 Residential Loading Dock ◦ 1 Retail /Residential Loading Dock 2 Residential Lobbies

R

15

Design Guidelines Study of Motor Court

1 2th. St

•••••••••••••••

•• •• •• •

Not grun; Bollards in lieu o F sidewalk

/~t----t;;;t- Goro9 •

romp /en9th required is longer

ehan shown on design guidelines

w ~ Ci5 rn

.r::

"LU