SPRC 2 Follow-Up - Arlingtonva

Report 1 Downloads 50 Views
Agenda 1. SPRC #2 Follow-Up 2. Transportation: • Infrastructure • Transportation Improvements • Automobile Parking • Deliveries 3. Open Space: • Orientation and Use • Relationship to Adjacent • Compliance • Landscape Plan 4. Q & A / Discussion

16 Sep 2015 SPRC #3 Pg 1

SPRC 2 Follow-Up: a) b) c) d)

Bridge update Connectivity – Randolph Street and Liberty Center South Pedestrian Pathway Mews – Scale, Proportions, and Materials Palette Glebe Road Enhancements

16 Sep 2015 SPRC #3 Pg 2

Proposed Bridge Alignment

Note that this image is provided for illustrative purposes only to demonstrate the proposed bridge alignment. The final design of the bridge will be developed through a future effort involving community participation.

SPRC 2 Follow-up – Wilson Boulevard Bridge Update

16 Sep 2015 SPRC #3 Pg 3

Pedestrian Bridge Above

Upper Plaza

Steps to lower plaza Escalator to lower plaza

NEW ELEVATOR to CONNECT ALL MALL LEVELS: Adjacency (and access) to Key Pedestrian Points: Lower Plaza Below N

• • • •

Lower Plaza Wilson Boulevard Bridge Landing at Upper Level Key Mall Entry Point from Grade Escalators and Steps

GROUND LEVEL

SPRC 2 Follow-up – Wilson Boulevard Bridge Update

16 Sep 2015 SPRC #3 Pg 4

4040 WILSON BLVD (Under Const)

Connection to Mews • • • •

8’ Wide with 10’ Ceiling Well Lit & Security Monitored Fully HC Accessible Same hours as Wilson Bridge

675 N Randolph (DARPA)

COUNTY GARAGE

16 Sep 2015 SPRC #3

SPRC 2 Follow-Up – Randolph Street Connectivity

Pg 5 Key

Connection to Mews

16 Sep 2015 SPRC #3

SPRC 2 Follow-Up – Randolph Street Connectivity

Pg 6 Key

SPRC 2 Follow-up: Mews Scale, Proportions, and Materials

16 Sep 2015 SPRC #3 Pg 7 Key

Proposed Section A

Proposed Section B A

B

SPRC 2 Follow-up: Mews Scale, Proportions, and Materials

16 Sep 2015 SPRC #3 Pg 8 Key

Mews UK

19.5’

+/- 24’

20’

Cady’s Alley DC City Center DC

SPRC 2 Follow-up: Mews Scale, Proportions, and Materials

16 Sep 2015 SPRC #3 Pg 9

Previous Design

Current Design SPRC 2 Follow-up: Mews Scale, Proportions, and Materials

16 Sep 2015 SPRC #3 Pg 10 Key

Current Design SPRC 2 Follow-up: Mews Scale, Proportions, and Materials

16 Sep 2015 SPRC #3 Pg 11 Key

CONTEXT ELEVATION Dedicated Office Entry

New Mall Entry

PLAN VIEW

SPRC 2 Follow-up – Glebe Enhancements

16 Sep 2015 SPRC #3 Pg 12

Continuous Tree Planting Concrete Paving

Granite Paving

Light Totems

Street Furniture

Streetscape elements match treatment at Wilson Blvd: • Continuous Street Tree Planting • Sidewalk Paving • Totem Concept • Street Furniture

Separate Entrances are now provided for retail and office uses

Glebe Road Existing parking has been removed and sidewalk extended

Off Peak Parking

Café Seating Zones

Granite ‘carpet’ at pedestrian entrances

16 Sep 2015 SPRC #3

SPRC 2 Follow-up – Glebe Enhancements

Pg 13 Key

16 Sep 2015 SPRC #3

SPRC 2 Follow-up – Glebe Enhancements

Pg 14 Key

Transportation 1.

2. 3.

4.

Infrastructure: • Context Map, Bus Routes, Bus Stops • Bicycle paths, Bike Share and Car Share Locations • Vehicular and pedestrian circulation diagram • Street Dimensions - Existing and proposed Transportation Improvements Parking: • Automobile Parking • Bicycle Parking Loading and servicing

Transportation – Agenda

16 Sep 2015 SPRC #3 Pg 15

Transportation – Context

16 Sep 2015 SPRC #3 Pg 16

Transportation – Bus Routes

16 Sep 2015 SPRC #3 Pg 17

Transportation – Bus Stops and Crossings

16 Sep 2015 SPRC #3 Pg 18

17

11

9 10

2 10

1

1

1

11

1

1 1

1

3

1

17

KEY:

15

Car Share Services Capital Bike Share

2 3

Dedicated Bike Lanes Shared Auto/Bike Lanes

11 1

Transportation – Bicycle Path, Bike Share and Car Share Locations

16 Sep 2015 SPRC #3 Pg 19

Wilson Blvd

New Office Entry

Buch Site

West Plaza

Office Entry

Mews

East Plaza

Residential Entry

Store Entry POTENTIAL TENANT ENTRANCES

Parking & Service

RETAIL RETAIL CIRCULATION / SVC BUILDING CIRCULATION RESIDENTIAL UNITS RESIDENTIAL AMENITY OFFICE VERTICAL CIRCULATION

New Office Entry

Existing County Parking Garage

Office Entry Concourse Entry

Transportation – Circulation through project

16 Sep 2015 SPRC #3 Pg 20

Proposed Curb Line N

Existing Curb Line

• • • • • • • • • •

Existing Sidewalk Width (BOC to FOB) = +/- 12’-0” TO +/-68’-0” Proposed Sidewalk Width (BOC to FOB) = +/-19’-6” TO +/-71’-0” (10’ clear minimum maintained) Curb to Curb width is reduced along project frontage Installation of new pedestrian bridge spaces the reduced width roadway Mid block crossing is shortened by +/- 17’ and center median is largely removed New lane alignment reduced the bow in the current roadway Removal of dedicated right turn land at Randolph in favor of shared “thru-right” Traffic signal pole to remain – ongoing coordination with County’s signalization plan Installation of Nub at N Randolph Street corner and new crosswalk Upgraded streetscape, including: paving materials, bike racks, street lights, street furniture, increased quantity and quality of planting areas.

16 Sep 2015 SPRC #3

Transportation – Wilson Boulevard

Pg 21 Key

Existing Curb Line

Proposed Curb Line

N

• • • • • • •

Curb-to-curb width and striping remains the same Installation of nub at Wilson Blvd. corner and new crosswalk Existing Sidewalk Width (BOC to FOB) = +/- 16’-0” Proposed Sidewalk Width (BOC to FOB) = +/-16’-8” TO +/-21’-0” (10’-0” clear with +/-8’ at bus shelter) Traffic signal pole to remain - ongoing coordination with County’s signalization plan Upgraded bus shelters (2) to serve the existing bus stop (which is to remain) Upgraded streetscape, including: paving materials, bike racks, street lights, street furniture, increased quantity and quality of planting areas

16 Sep 2015 SPRC #3

Transportation – N Randolph Street

Pg 22 Key

Existing Curb Line

Proposed Curb Line

N

• • • • • •

Curb-to-curb width and striping remains the same (except removal of parallel spaces) Existing Sidewalk Width (BOC to FOB) = +/- 5’-0” ’MIN. TO 47’-6” MAX. Proposed Sidewalk Width (BOC to FOB) = +/- 5’-0” MIN (exiting pinchpoint. TO 55’-6” MAX (8’-0” clear minimum maintained). Pursuing VDOT approval of “off-Peak” parallel parking on Glebe Road - from Randolph to the mid-block cut-through at Macys Pursuing VDOT approval to plant in the existing Glebe Road median Upgraded streetscape, including: paving materials, bike racks, street lights, street furniture, increased quantity and quality of planting areas.

16 Sep 2015 SPRC #3

Transportation – Glebe Road

Pg 23 Key

Transportation Improvements: • Reducing pedestrian crossing distance across Wilson Blvd • Increasing sidewalk widths • Removal of right turn lane only on Wilson Blvd • Improving alignment of eastbound travel lanes on Wilson Blvd • Re-building pedestrian bridge over Wilson Blvd • Pursuing off-peak street parking on Glebe Road • Pursuing filling in three parking spaces on Glebe Road • No new curb cuts • Traffic Demand Management Plan in Conjunction with County Staff

Transportation Improvements

16 Sep 2015 SPRC #3 Pg 24

ON-STREET PARKING: Glebe: • Exist: 2 metered HC +1 unmetered loading • Proposed: 0 via removal of existing spaces • Pursuing +/- 900 linear feet of off peak parking w/ VDOT. N Randolph: • Exist: +/- 131 linear feet of multi-meter parking • Proposed: no change

Wilson Boulevard: • Exist: +/- 420 linear feet of multi-meter parking • Proposed: +/- 330 linear feet of multi-meter parking

Transportation – On-Street Parking

16 Sep 2015 SPRC #3 Pg 25

Residential Building Parking: • 288 Total Automobile Spaces + 8 Motorcycle Spaces • 4 Subterranean Levels • 0.7 Automobile spaces per Apartment Unit (excluding motorcycle spaces) • 13% Compact Space Ratio • Access from Randolph Street uses Existing Service Ramp Location • No New Curb Cuts for the Entire Project

Transportation – Residential Parking

16 Sep 2015 SPRC #3 Pg 26

Mall / Office Buildings:

Residential Building:

52 Class III Bike Spaces

20 Class III Bike Spaces

At Grade for Visitors and Retail Patrons

At Grade for Visitors and Retail Patrons

(51 spaces required)

(20 spaces required)

166 Class I Bike Spaces In P1 and P2 levels of Garage for Residents and Retail Employees

Macy’s / Office Abv:

(166 spaces required)

26 Class III Bike Spaces At Grade for Visitors and Retail Patrons (26 spaces required)

Additional existing bicycle spaces In existing County Garage for Office and Retail Employees, and Visitors

Transportation – Bicycle Parking

16 Sep 2015 SPRC #3 Pg 27

Macy’s/ Buch

17 16

1

15 14 13 12

2

E*Trade

MALL

4200 Wilson

Res Bldg

TOTAL

Loading Sp Req’d

Retail Area (GSF)

148,353

(with mall)

325,955

0

51,860

526,168

8

Office Area (GSF)

156,563

161,000

0

183,691

0

501,254

1

Residential (Apt Units)

0

0

0

0

406

406

3

11 10

3 4

9

5 6

8 7

17 LOADING SPACES ARE PROVIDED: (These spaces currently exist)

3 Spaces are provided for Residential Use; (3 are required) (12 ft wide by 40 ft long by 14 feet high)

14 Spaces are provided for Non Residential Use; (9 are required)

Key Plan

(12 ft wide by 25 ft long by 14 feet high)

Transportation – Loading and Servicing

16 Sep 2015 SPRC #3 Pg 28

Open Space Design 1. 2. 3. 4.

Overview West Plaza East Plaza Streetscape • Wilson Blvd • N. Randolph Street • Glebe Road

Open Space – Agenda

16 Sep 2015 SPRC #3 Pg 29

OPEN SPACE SUMMARY: 35,875 sf Existing Open Space 8,200 sf Net Added Open Space (at sidewalk area) +/-28,700 sf Open Space Previously Enclosed (on multiple levels)

a)

*

Open Space – Overview

16 Sep 2015 SPRC #3 Pg 30

TREE SUMMARY: 30 Existing Street Trees in Public Space 43 Street Trees Proposed upon Full Build Out

Open Space – Overview

16 Sep 2015 SPRC #3 Pg 31

Upper Plaza • Seating / Planting Areas • Feature Elements/Totems

• 18 inch stepped seating • Interspersed lush planting • Wood/Stone warm mat’ls

Lower Plaza

109’

Ampitheater

54’ +/-2,500 SF

• Flexible Program-focused • Multi-Use

16 Sep 2015 SPRC #3

Open Space – West Plaza

Pg 32 Key

Wilson Boulevard

16 Sep 2015 SPRC #3

Open Space – West Plaza

Pg 33 Key

Holiday Events

Outdoor Dining

16 Sep 2015 SPRC #3

Open Space – West Plaza

Pg 34 Key

16 Sep 2015 SPRC #3

Open Space – West Plaza

Pg 35 Key

16 Sep 2015 SPRC #3

Open Space – West Plaza

Pg 36 Key

Feb View

16 Sep 2015 SPRC #3

Open Space – West Plaza (Winter)

Pg 37 Key

16 Sep 2015 SPRC #3

Open Space – West Plaza

Pg 38 Key

+/-28’

+/-150’

Include Street Rendering

+/-36’

16 Sep 2015 SPRC #3

Open Space – East Plaza

Pg 39 Key

16 Sep 2015 SPRC #3

Streetscape – Wilson Boulevard

Pg 40 Key

16 Sep 2015 SPRC #3

Streetscape – Wilson Boulevard

Pg 41 Key

16 Sep 2015 SPRC #3

Streetscape – Wilson Boulevard

Pg 42 Key

8’ CLEAR PATH

Future Pedestrian Pathway

16 Sep 2015 SPRC #3

Streetscape - Randolph

Pg 43 Key

16 Sep 2015 SPRC #3

Streetscape – Glebe Road

Pg 44 Key

Thank You

16 Sep 2015 SPRC #3 Pg 45