Gt'nt'n l Mnnag,•r 334 Front Street Ketc:.hi.k:.~ n, AK 9990 I

Phonl' (907) 128 -5603 Fax (907) 22 5-507 5

TRANSMITTAL MEMORANDUM TO:

The Honorable Mayor and City Council

FROM:

Karl R Amylon , General Manager

DATE:

June 19, 2017

RE:

Report of June 10, 2017 Power Outage

Attached for City Council review is a memorandum from Electric System Engineering Manager Jeremy Bynum regarding the power outage of June 10, 2017. Mr. Bynum and Electric Division Manager Andy Donato will be attending the City Council meeting of July 6, 2017, in order to address any questions and/or concerns that Councilmembers may have.

AGENDA - 07/06/17- KPUMR1

Electric Division I 065 Fair Street Ketchikan, AK 99901

Your Ctmrmrmity, Your Utility

Phone: (907) 22 5-5505 Fax (907) 247-0755

TRANSMITTAL MEMORANDUM TO:

Karl Amylon, KPU Manager David Martin, KPU Assistant Manager

FROM:

Jeremy Bynum PE, Electric System Engineering Manager

DATE:

June 16, 2017

SUBJECT:

Electrical Outage of 6/10/2017

On Saturday, June 10, 2017, at 3:30PM, an outage affected all electric services in Ketchikan. This outage was caused by a fault on the power system when an eagle contacted the 34.5kV line. This contact occurred at 7.5 mile South Tongass Highway causing protective relaying to open the 34.5kV Mountain Point South Tie Breaker. This resulted in a sudden loss of generation, approximately 6 MW, causing system instability, resulting in a system-wide load-shed event. All KPU system feeders opened during the event causing a system-wide power outage. KPU operators quickly identified the issue and immediately began power restoration. The restoration process is handled step-by-step as it takes time to ensure system stability as each feeder in the system is closed. Initially all 7,649 customers were affected by the outage. Within 87 minutes, power was restored to all customers.

Location Bethe FlJ Bethe F4T Port West FIN Port West F2S Port West F3 KTNF1 KTNF2 KTN F3 KTNF4

c e ue 0~eratIOn Shdl Open Close 15:30 16:11 15 :30 16:13 15 :30 15:50 15:30 16:57 15:30 15:49 15:30 16:15 15:30 16:17 15:30 16:23 15:30 16:49

Duration (hr:min) 0:41 0:43 0:20 1:27 0: 19 0:45 0:47 0:53 1:19

Page 1 of 2

01perat10n sc hed u le (contmued) Mountain Point F IN Mountain Point F2S Ward Cove FlS Ward Cove F2N Point Higgins F 1S Point Higgins F2N

Cc:

15:30 15:30 15:30 15:30 15:30 15:30

16:51 16:41 15:53 15:49 15:44 15:55

1:21 1:11 0:23 0:19 0:14 0:25

Andy Donato, Electric Division Manager Mark Adams, Electric Division Operations Manager Diane Walker, Administrative Assistant