1401 Wilson Boulevard & 1400 Key Boulevard Rosslyn, Arlington Count y, Virginia Site Plan Review Committee Meeting #3 O c tober 21, 2013
SPRC #3 Agenda 1 Follow Up • Pedestrian Connection between Oak Street & Nash Street - Physical & Visual - Design Constraints • Office Building’s Relationship to Wilson Boulevard 2 Site Design & Characteristics
Source: Goody Clancy presentation to the Process Panel on 9.25.13
19
9
Relationship to Other Buildings N. COLONIAL CT.
Art Association West* +149.10’ The Gallery at Rosslyn* +190.80’
Art Association East* +149.50’
. VD BL
N. OAK ST.
200’
Office Tower** Main Roof +299.81’ PH Roof +322.81’
N. N
ASH
Commonwealth Tower* +200.20’
N. NASH ST.
Ames Center* +140.70’
Arlington Temple* +59.00’
Key Building +143.61’
Rosslyn Center* +248.50’
FORT MYER DR.
1812 N. Moore St.** Vepco* Substation +390.00’ Rosslyn Metro* +38.60’ +35.20’
N. MOORE ST.
Office Tower +387.6’
Central Place**
Residence Tower +348.6’
19TH ST.
Berkley Building +161.36’
400’ RADIUS
FORT MYER DR.
WILSON BLVD.
Park Place* +150.41’
Metro Rosslyn* +52.90’
Turnberry Towers* +312.00’
Hyatt Hotel* +171.60’
FORT MYER DR.
ST.
Residential Tower** Main Roof +295.50’ PH Roof +313.49’
KEY BLVD.
Architect’s Building* +153.60’
WILSON BLVD.
50’ 100’
N. COLONIAL TERRACE
N DO EN AR CL
*Building height taken from ground shot (GS) provided by Arlington County Record information. **Building height taken from average site elevation (ASE) provided by 4.1 Submissions.
Source: Goody Clancy presentation to the Process panel on 9.25.13
65
39
Southwest View From Central Place Observation Deck Rosslyn-Ballston Corridor
Central Place
Aerial View
View From Central Place’s Observation Deck (el. 436.50’) looking Southwest 40
West View From Central Place Observation Deck Potomac River
Potomac Gorge
Georgetown
Central Place
Aerial View
View From Central Place’s Observation Deck (el. 436.50’) looking West 41
Historic Status of Existing Buildings on Site
42
Historic Status of Existing Buildings on Site Commemorative plaque to remain in public right of way.
43
Compliance with Adopted Planning Documents
44
Compliance with Adopted & Draft Planning Documents General Land Use Plan (GLUP) Master Transportation Plan (MTP) Draft Rosslyn Multimodal Study Rosslyn-Ballston Corridor Streetscape Standards Ongoing coordination with Rosslyn Sector Plan Update effort Adopted Retail Action Plan and September 2013 Draft Priorities identified in Arlington Economic Development’s 2007 “Grocery Store Trends” analysis 45