60.0m 60.0m 60.0m 60.0m 60.0m 6 0 .0 m 6 0 .0 m 60.0m 6 0 .0 m ...

Report 2 Downloads 176 Views
0m . 80

60

0m 60. 7 95 9+

m .0 0 6

6 0 . 0 m 0 00 9+

6 0 . 0 m

Staveley Infrastructure Maintenance Depot

0m . 0 6

2 0 3 1 9 5 0 9 1 DPPT R D MM 1 2 gC3 n wi a oDr t r e f e R n o i t a u n i t n Co r o F

0m . 60

0 0 0 + 7

8 0 . 0 m

0 00 8+

Indicative extent of A619 realignment over HS2

80 . 0m

0m . 60

0m . 60 HS2 viaduct over River Rother floodplain

0m . 80

Plan Scale 1:5,000 @ A1

HS2 Staveley Infrastructure Maintenance Depot

Existing Railway Network

100

100

90

90

A619

B6053

80

80 HS2 viaduct over River Rother floodplain - 370m

River Rother

Hall Lane

TP.61. 6

TP.61. 3 CH. 9838. 6

CH. 9807. 3

TP.58. 7

TP.58. 4

TP.58. 2

TP.51. 9

CH. 7185. 0

40

TP.52. 0

CH. 7111. 0

50

TP.58. 4 CH. 9605. 8

60

CH. 9572. 5

60

CH. 8323. 7

70

CH. 8252. 9

70

50

River Rother 40

50

100

JV

AR

9+950 9+957 9957. 3

9+900 TP9876. 8

61. 9 61. 9 0. 0 0. 0

61. 9 61. 9

61. 8 0. 0

61. 8

61. 6 +2. 8

58. 8

61. 3 0. 2

61. 5

60. 6 0. 5

61. 1

9+850

9+800 PCC9810. 5

9+750

9+700 61. 1 59. 9 1. 2

61. 1 59. 3 1. 8

61. 1 58. 6 2. 5

61. 9 58. 4

58. 4 4. 8

3. 5

58. 4 4. 8

63. 2

58. 4 4. 0

63. 2

58. 4 3. 6

62. 4

62. 0

58. 4 4. 2

62. 6

58. 4 4. 2

62. 6

58. 4 4. 6

63. 0

58. 4 4. 3

62. 7

58. 4 4. 4

62. 8

58. 4 4. 2

62. 6

58. 4 3. 5

61. 9

58. 4 3. 0

61. 4

58. 4 2. 4

60. 8

58. 4 2. 1

60. 5

58. 4 1. 2

59. 6

58. 4 0. 6

59. 0

9+650

9+600

9+550 9552. 3

9+500

9+450

9+400

9+350

9+300 TP9299. 4

9+250

9+200

9+150

9+100

9+050

9+000

8+950

8+900

8+850

8+800

8+750

8+700 58. 6 58. 4

28/06/17

Legends/Notes:

Ordnance Survey Licence number 100049190

Legend

World Heritage Site

Scheduled Monuments

Track Centrelines

Ramsar

Registered Parks and Gardens

Viaduct

Special Areas of Conservation

Historical Battlefields

Tunnel

Special Protection Areas

Active and/or Authorised Landfill

Existing Railway Connection

SSSI

Historical Landfill

HS2 Connection

Flood Zones

Fully Retained Cutting/Fill Major Contour

National Nature Reserves Area of Outstanding Natural

This material was last updated on 2017 and may not be copied, distributed,

Beauty

sold or published without the formal permission of Land Registry.

National Park Major Development Sites

Scale with caution as distortion can occur. HS2 App

Project/Contract

Zone

Key Environmental Features Legend

Additional Development Sites

Con App

8+650

0. 2

MM

may be used for legal or other official purposes.

Checked

7 8. 11 9% L= 8 2 R=3000.0 0. = G L=31.3

Scale H:1:5,000 V:1:500 @ A1

Only an official copy of a title plan or register obtained from the Land Registry

Drawn

6 . 1 0 2 = L 1 3% 3 . 1 G=

L=66.2

Profile

50

Staveley Infrastructure Maintenance Depot

or if it is issued in part or issued incompletely in any way.

Registry under delegated authority from the Controller of HMSO.

Description

57. 9 58. 4

11/07/17

© Crown Copyright material is reproduced with the permission of Land

Rev

8+600

+0. 5

20

© Crown Copyright and database right 2017. All rights reserved. 28/06/17

56. 8 58. 4

10

HS2 accepts no responsibility for any circumstances which arise from

P01 28/06/17

8+550

+1. 6

5

the reproduction of this document after alteration, amendment or abbreviation

First Issue

55. 7 58. 4 +2. 7

MM

P02 11/07/17

54. 5 58. 4 +3. 9

53. 7 58. 4 +4. 7

52. 7 58. 4 +5. 7

51. 7 58. 4 +6. 7

51. 8 58. 4 +6. 6

51. 5 58. 2 +6. 7

51. 9 57. 9 +6. 0

48. 4 57. 6 +9. 2

53. 0 57. 3 +4. 3

53. 3 57. 0 +3. 7

0 METRES @ 1:500

11/07/17

9125. 8

TP7988. 3

56. 7 +2. 9

53. 8

56. 4 +2. 1

54. 3

56. 2 +1. 0

500

AR

8+500

8+450

8+400

8+350

8+300

8+250

8+200

8+150

8+100

8+050

8+000

7+950

7+900

55. 9 0. 0

55. 2

55. 6 1. 1

55. 9

55. 3 2. 1

56. 7

55. 0 2. 4

57. 4

54. 7 3. 2

57. 4

54. 4 3. 9

57. 9

54. 1 4. 1

58. 3

53. 8 5. 3

58. 2

53. 5 4. 5

59. 1

53. 2 4. 0

58. 0

52. 9 3. 9

57. 2

52. 6 3. 4

56. 8

R=-2500.0

52. 3

56. 0

G=0.000%

3. 4

55. 7

R=12000.0

52. 0

55. 1

L=33.3

3. 1

55. 1

L=1248.7

51. 8

200

JV

L=258.2

L=80.5

R=-1000

30

50km/h

METRES @ 1:5000

Client's Comments Addressed

R=-504.0

L=70.8

Design Speed:

0

L=253.0

3. 3

54. 8

7914. 9

7+850 7866. 9

7+800 7836. 9

7+750

7+700

7+650

7+600

7+550

7+500

7+450

7+400

7+350

7+300

7+250

7+200

7+150

7+100 7081. 7

7+050 7051. 7

55. 1

R=-6000.0

L=173.6

52. 0

Cut and Fill

9 . 7 6 0 1 = L % 0 9 5 . 0 G=

L=74.0

R=300.0

2. 8

Proposed Level

L=48.0

L=755.2

L=1137.5

52. 3

Existing Level

L= G= 676 . 9 0. 64 2%

L=73.4

2. 8

Vertical Alignment

R=-401.0

L= 3 L=396.7 0. 0

54. 9

Horizontal Alignment

R=750.0

0 . 30 L=

52. 7

Chainage

2. 2

30

7+000

Works Road

10

Listed Building Grade I

West Midlands to Leeds Route

Registered in England

Engineering Earthworks

Registration No. 06791686

Design Stage

Discipline/Function

Registered office: 2 Snow Hill,

Railway Cutting

Post-Consultation

Queensway,

Railway Track

Birmingham, B4 6GA Drawing Title

Drawn

Checked

JV

Railway Embankment

Date

Track Profile

Listed Building Grade II

Minor Contour

HS2 Depot/Station

Node

Operational Boundary

AR

MM

Staveley Depot

Ground Profile

Listed Building Grade II*

Approved

2017 Preferred Route Creator/Originator

Sheet 3 of 3 Mott MacDonald

Scale

07/06/2017

Size

1:5000

Drawing No.

C321-MMD-RT-DPP-190-591303

A1 Rev.

P02