Submittal #15000-001.0 15000 - HVAC

Report 2 Downloads 345 Views
Submittal #15000-001.0 15000 - HVAC HITT Contracting Inc. 2900 Fairview Park Drive Falls Church, Virginia 22042 Phone: (703) 846-9000  Fax: (703) 846-9110

Project:  Capital One - Silverline 7900 Westpark Drive McLean, Virginia 22102

TRANSMITTAL Product Data CRAC 11-1

SPEC SECTION:

15000 - HVAC 

CREATED BY:

Ryan Hardey(HITT Contracting Inc. - HQ)

STATUS: 

Submitted

DATE CREATED: 

03/24/2016 

ISSUE DATE:

03/24/2016 

REVISION:

0

RESPONSIBLE CONTRACTOR:

The Severn Group - VA

RECEIVED FROM:

Chris  Petrakes

RECEIVED DATE:   03/24/2016

SUBMIT BY: 

03/24/2016 

FINAL DUE DATE: 03/31/2016

LOCATION: 

 

TYPE:

COST CODE: 

Product Data

BALL IN COURT: Bradley Brogdon (Gensler - NC Charlotte)  DISTRIBUTION: Jay Yeman (Dunlap & Partners Engineers, PC ), Roy Sebring (McKinney & Company), Jim  Collins (Gensler - NC Charlotte), Ally Cardamone  (HITT Contracting Inc. - HQ), Jonathan Blair (Gensler - DC) DESCRIPTION: **Please see attached CRAC 11-1 ** Please return to HITT with all comments no later than 03/31/2016.     Roy - Please make sure to send all of your comments to Bradley so he can input them into Procore ! ATTACHMENTS: 15000-01 Severn Group (Liebert Unit).pdf   

SUBMITTAL WORKFLOW

# 1 

NAME Bradley Brogdon

BY

HITT Contracting Inc.

SUBMITTER/ APPROVER

SENT DATE

DUE DATE

Approver 

3/24/2016

3/31/2016

DATE

RETURNED RESPONSE DATE

ATTACHMENTS

COMMENTS

Pending

COPIES TO

Page 1 of 2

Printed On: 03/24/2016 04:58 PM

2900 Fairview Park Drive HITT Contracting Inc. Falls Church, Virginia 22042

SUBMITTAL COVER SHEET Capital One - Silverline  

Owner: 

General Contractor: HITT Contracting

Designer: 

Subcontractor: The Severn Group - VA

MEP Engineer: 

Interior Designer: 

Structural Engineer: 

 

 

 

 

Submittal

Rev.

Description

Submitted For:

 

 

15000-001

0

Product Data CRAC 11-1

Review  & Approval 

 

 

  General Contractor's Approval:

 

Engineer's Approval:

 

 

 

 

 

 

Consultant's Approval:

 

 

 

 

HITT CONTRACTING INC CAPITAL ONE - SILVERLINE  

REVIEWED

 

REVIEWED AS CORRECTED

 

REVISE AND RESUBMIT

 

REJECTED

 

FOR INFORMATION ONLY

Reviewed in accordance with AIA 201 and the Contract Documents. This submittal is in full compliance with the Construction Documents except as explicitly noted.  

 

BY: Ryan Hardey

DATE: 3/24/2016

 

 

SUBMITTAL #    

DESCRIPTION

15000-001   Product Data CRAC 11-1

SUBMITTAL REVIEW

 

  Architect's Approval: NO EXCEPTIONS TAKEN. MAKE CORRECTIONS AS NOTED. Resubmittal not required unless Contractor cannot comply with corrections noted. REVISE AS NOTED AND RESUBMIT. RESUBMIT PROPERLY. Submittal not reviewed for reasons noted. NOT REVIEWED. Submittal not required by Contract Documents. RECEIVED FOR CLIENT’S RECORD ONLY. Submittal not reviewed.

            Gensler has reviewed this Submittal, but only for the purpose of checking   for conformance with the design intent expressed in the Contract   Documents. Gensler’s action on a specific item does not indicate approval of   an assembly of which the item is a component, nor of an item as delivered and installed if it does not conform to the Contract Documents.   Contractor is responsible for checking for deviations between this   Submittal and differing information or conditions in the Contract Documents and field conditions; for determining or substantiating   the accuracy and completeness of other details such as dimensions and   quantities; for substantiating instructions for installation or performance of equipment or systems designed by Contractor; for construction means,   methods, techniques, schedules, sequences, procedures, and fabrication   processes; for errors and omissions in Submittals; for coordination of the Work   of the trades, safety precautions and performing the Work in a safe and satisfactory manner and in conformance with the Contract   Documents. If  more than one submittal review stamp appears on this Submittal, the most stringent action and notations thereon apply. Signature of a     submittal review stamp by Gensler or a consultant does not imply that it   has reviewed work not within its professional discipline or scope of services.

By:

v1 3/2012

Brad Brogdon

Project No: 09.8337.000 Submittal:

15000-001

See McKinney comments.

Date: Wed Mar 30, 2016

Submittal Data Date: 03-30-2016 Roy Sebring McKinney and Company 100 South Railroad Avenue Ashland, VA 23005

A B C

RE:

15196 Capital One Project Y

D

ACTION CODE No exceptions taken. Make corrections to exceptions noted. Resubmittal not required. Make corrections to exceptions noted and resubmit. Not in compliance with contract documents. Rejected.

WE ARE SENDING YOU: Qty

Submittal Date

Spec. No.

Action

1

3/30/16

238123

B

Description CRAC Units

Review of this data is only for conformance with the design concept as given in the Contract Documents. The Contractor is responsible for: quantities, functions, dimensions and coordination of the work with other trades COMMENTS:

Delete floor stand accessory. Provide dual-float condensate pump. Provide 18" high supply air discharge plenum with 2/way grilles (front and left when facing the unit).

Jay C. Yeman, PE Senior Mechanical Engineer Copy to:

MECHANICAL•ELECTRICAL•PLUMBING•FIRE PROTECTION 2112 W. Laburnum Avenue, Suite 205; Richmond, VA 23227 • 804-358-9200 Telephone • 804-358-2928 Facsimile • ww.DunlapPartners.com

15097 - 238123 - CRAC Unit Comments (Rev 0).xls