Reports of December 30 and 31, 2017 Power Outages

Attached for City Council review is memoranda from Electric System Engineering Manager Jeremy Bynum regarding the power outages of December 30 and 31 , 2017. Mr. Bynum and Electric Division Manager Andy Donato will be attending the City Council meeting of January 18, 2018, in order to address any questions and/or concerns that Councilmembers may have.

AGENDA- 01/18/18- KPUMR2

Electric Division I 065 Fair Street Ketchikan, AK 9990 I

Your CDmmuniiJ> Yo..r Utility

Phone: (907) 225-5505 Fax (907) 247-0755

TRANSMITTAL MEMORANDUM

TO:

Karl Amylon, KPU Manager David Martin, KPU Assistant Manager

FROM:

Jeremy Bynum PE, Electric System Engineering Manager

DATE:

January 3, 2018

SUBJECT:

Electrical Outage on December 30, 2017

On Saturday, December 30, 2017, at 12:49 AM, an outage affected electric services in town and north of Ketchikan. This outage was caused when a vehicle struck a pole near mile 4.3 South Tongass Highway. The event caused minor pole damage and a momentary "phase-to-phase" fault which was sensed by protective relaying; this opened the 34.5kV Mountain Point North and Ketchikan South Tie Breakers. The sudden loss of approximately 4.6 MW of generation triggered a load-shed event causing two (2) KPU system feeders to open resulting in a power outage. KPU crews and operators quickly identified the issue and began power restoration. 1,305 customers were affected by the outage and power was restored all within 23 minutes.

Location Ketchikan F3 Point Higgins F 1S Ketchikan 34.5kV South Mountain Point 34.5kV North

Cc:

01peraf10n Shdl c e ue Open Close 00:49 01:12 00:49 01:01 00:49 04:47 00:49 06:01

Duration (hr:min) 0:23 0:12 3:58 5:12

Andy Donato, Electric Division Manager Mark Adams, Electric Division Operations Manager Diane Walker, Administrative Assistant

Page I of 1

Electric Division I 065 Fair Street Ketchikan, AK 9990 1

Y6ur Communi~], Your Utility

Phone: (907) 225-5505 Fax (907) 247-0755

TRANSMITTAL MEMORANDUM

TO:

Karl Amylon, KPU Manager David Martin, KPU Assistant Manager

FROM:

Jeremy Bynum PE, Electric System Engineering Manager

DATE:

January 3, 20 18

SUBJECT:

Electrical Outage on 12/3112017

On Sunday, December 31, 2017 at 6:54AM, an outage affected system-wide electric services caused by a loss of generation from Southeastern Alaska Power Agency (SEAPA). This was caused by a system failure within Unit 1 at the Tyee Powerplant. The event created a sudden loss of approximately 7.0 MW of generation, system instability, and a load-shed event causing five (5) KPU system feeders to open resulting in a power outage. KPU personnel and operators quickly identified the issue and began power restoration. 2,680 customers were affected by the outage and power was restored to all within 32 minutes.

Location Ketchikan F3 Mountain Point F 1N Mountain Point F2S Point Higgins Fl S Point Higgins F2N

01perat10n schedu1e Open Close 06:54 07:05 06:54 07:23 07:25 06:54 07:26 06:54 06:54 07:12

Duration (hr:min) 0:11 0:29 0:31 0:32 0:18