4 0 .0 m 60.0m Plan Profile High Speed Station

Report 1 Downloads 102 Views
m .0 0 6

60 . 0m Indicative extent of M56 temporary realignment

60 . 0m

4 0 . 0m

60 . 0m

6 0 . 0 m

Extensive road remodelling required on

068286 240DPPRTAECng C320awi o Dr ert on Ref i nuat i ForCont

TDP P240 068 284 320 AE CR

0m . 60

r awi ng C

Manchester Airport High Speed Station

C320-AEC-RT-DPP-240-068280

60 . 0m

Manchester Airport High Speed Station - Platforms. Refer to drawing

HS2 crossing under M56

HS2 twin tunnels

0m . 60

A538 Hale Road

Operational Boundary

6 0 . 0 m

HS2 Station

HS2 crossing under

ef ert oD

14+000

cross over HS2

13+000

For Con t i nua t i on R

15+000

A538 realignment to

15+000

12+ 000

Indicative extent of

60 . 0m

motorway and junctions

6 0 . 0 m

40 . 0m 60 . 0m

Plan Scale 1:5,000 @ A1

HS2 twin tunnels - 12770m 80

80

M56

A538 Hale Road

Hasty Lane

Thorley Lane HS2 platforms - 415m

70

70

Timperley Brook

50

CH. 14147. 2

Manchester Airport High Speed Station - Platforms

40

TP.48. 6

50

TP.54. 3

60

CH. 13613. 9

60

40

15+000

14+950

14+900

14+850

14+800

14+750

14+700

14+650

14+600

14+550

14+500

14+450

14+400

14+350

57. 7 27. 3 30. 4

57. 8 28. 5 29. 3

58. 5 29. 8 28. 7

59. 1 31. 0 28. 1

59. 7 32. 3 27. 4

60. 5 33. 5 27. 0

61. 0 34. 8 26. 2

61. 4 36. 0 25. 4

65. 0 37. 3 27. 7

70. 7 38. 5 32. 2

62. 3 39. 8 22. 5

61. 6

62. 2

62. 7

62. 6

41. 0

46. 0 17. 4

20. 6

47. 3 16. 4

42. 3

48. 5 15. 6

19. 9

49. 7 14. 3

43. 5

50. 8 12. 8

19. 2

51. 7 11. 0

44. 8

52. 5 8. 7

17. 8

53. 1 7. 8

63. 4

53. 7 7. 6

63. 7

54. 0 6. 1

64. 1

54. 3 4. 5

64. 0

54. 4 5. 0

63. 6

54. 4 7. 9

62. 7

54. 2 8. 1

61. 2

54. 0 8. 5

60. 9

53. 8 8. 0

61. 3

53. 6 8. 0

60. 1

53. 4 8. 1

58. 8

53. 2 7. 9

59. 4

53. 1 7. 8

62. 3

52. 9 7. 3

62. 3

52. 7 6. 6

62. 5

52. 5 6. 6

61. 8

61. 6

52. 3 10. 3

61. 5

52. 1 10. 0

61. 1

51. 9 10. 8

60. 9

51. 7 12. 0

60. 2

51. 5 12. 4

59. 3

51. 3 12. 8

59. 1

51. 1 12. 8

62. 6

50. 9 13. 3

62. 1

50. 8 12. 4

62. 7

50. 6 12. 7

63. 7

50. 4 12. 9

63. 9

50. 2 13. 1

220km/h

Design Speed:

14+300

14+250

14+200

14+150

14+100

14+050

14+000

13+950

13+900

13+850

13+800

13+750

13+700

13+650

13+600

13+550

13+500

13+450

13+400

13+350

13+300

13+250

13+200

13+150

13+100

13+050

13+000

12+950

12+900

12+850

50. 0 13. 4

64. 1

49. 8 13. 6

64. 2

63. 2

49. 6 14. 2

63. 3

49. 4 14. 3

63. 3

49. 2 14. 2

63. 3

49. 0 9. 6

63. 4

48. 8 10. 1

63. 4

48. 7 11. 6

63. 8

63. 7

63. 4

58. 6

48. 5 10. 1

58. 9

60. 3

L = 1 1 8 5 . 4 G= 2 . 5 0 0 %

48. 3

58. 6

L=533.4 R=18500.0

9. 0

57. 3

5 . 2 9 8 1 = L % 3 8 3 . 0 G=

48. 1

Cut and Fill

L=2236.7

9. 3

Proposed Level

57. 4

Vertical Alignment

Existing Level

12+800

12+750

12+650

12+700

12781. 3

L=1025.5

0 . 5 9 2 = L

63. 9

R=-2125.0

12+600

12+550

12+500

12+450

12+400

12+350

12+300

12486. 3

Horizontal Alignment

12+250

12+200

Chainage

12+150

20

12+100

20

12+050

30

12+000

30

230km/h

Profile 0

50

100

200

500

METRES @ 1:5000

0

5

10

20

Scale H:1:5,000 V:1:500 @ A1

50

METRES @ 1:500

Updated for acceptance

KB

TO

JG

P02

First Issue

11/07/17

11/07/17

11/07/17

KB

TO

JG

15/06/17

Legends/Notes:

the reproduction of this document after alteration, amendment or abbreviation

Key Environmental Features Legend

or if it is issued in part or issued incompletely in any way.

© Crown Copyright and database right 2017. All rights reserved.

P01 15/06/17

HS2 accepts no responsibility for any circumstances which arise from

Ordnance Survey Licence number 100049190

15/06/17

© Crown Copyright material is reproduced with the permission of Land Registry under delegated authority from the Controller of HMSO.

Legend

World Heritage Site

Scheduled Monuments

Track Centrelines

Ramsar

Registered Parks and Gardens

Viaduct

Special Areas of Conservation

Historical Battlefields

Tunnel

Special Protection Areas

Active and/or Authorised Landfill

Existing Railway Connection

SSSI

Historical Landfill

HS2 Connection

Flood Zones

Fully Retained Cutting/Fill Major Contour

National Nature Reserves This material was last updated on 2017 and may not be copied, distributed,

Area of Outstanding Natural

sold or published without the formal permission of Land Registry. Only an official copy of a title plan or register obtained from the Land Registry

Beauty

may be used for legal or other official purposes.

National Park Major Development Sites Additional Development Sites

10

Listed Building Grade I

Registered in England Registration No. 06791686 Registered office: 2 Snow Hill, Queensway, Birmingham, B4 6GA

Engineering Earthworks Railway Cutting

Description

Drawn

Checked

Con App

HS2 App

Scale with caution as distortion can occur.

Manchester Metropolitan Spur Design Stage

West Midlands to Manchester Route Discipline/Function

Post-Consultation Drawing Title

Railway Track Drawn

Checked

KB

Railway Embankment

Ground Profile

Date

Listed Building Grade II*

Track Profile

Listed Building Grade II

Minor Contour

HS2 Depot/Station

Node

Operational Boundary

Approved

TO

JG

2017 Preferred Route - HSM28B Plan and Profile Creator/Originator

Sheet 3 of 7 AECOM

Rev

Project/Contract

Zone

Scale

15/06/2017

AS SHOWN

Drawing No.

C320-AEC-RT-DPP-240-068285

Size

A1 Rev.

P02