INVESTING INFLOW AND INFILTRATION REDUCTION

IN

PROJECT AREA

Blue River North Project

Field Crews Working May 2015 - September 2015

YOUR INVESTMENTS AT WORK

INFLOW AND INFILTRATION REDUCTION Blue River North Project WHO?

WHAT? • Important field investigations of the sanitary collection system in your area.

WHAT TO EXPECT?

• KC Water Services assisted by Black &

• Various field crews inspecting

Veatch, Taliaferro & Browne, and TREKK Design Group.

manholes and cleaning the public sewer lines.

• Smoke from smoke testing activities.

WHY? • Investigate the existing sewers to determine locations of needed sewer repairs.

• Reduce risk and frequency of sanitary overflows and basement backups.

• Rehabilitate the aging sewer system. • Meet regulatory requirements as part

WHERE?

• Temporary street closures.

The project is located in Kansas City, Missouri within the following boundaries:

• Public meeting will be held to inform

• Northern boundary: 23rd Street

property owners about the field investigations and project schedule.

• Crews will knock on your door if

• Southern boundary: Blue Parkway

they need to inspect the sewer or manholes on your property.

• Eastern boundary: Blue Ridge Cutoff • Western boundary: Hardesty Avenue

• Crews will not ask to enter your home or building.

of KC’s Overflow Control Program.

IMPROVEMENTS? CONTRACT AMOUNT

• Current activity includes identifying

WHEN? • Field investigations will be ongoing May 2015 through September 2015.

• Design professional services will be conducted from February 2015 through March 2016.

• Construction will occur between July 2016 to December 2017.

needed sewer rehabilitation repairs.

Design professional services contract includes all services rendered through the construction phase of the project.

• $567,000

QUESTIONS? Specific questions about this project can be directed to:

• Khoa Nguyen, Project Manager, KC Water Services, 816-513-0264 or [email protected]

• Charlie Sievert, Project Manager, Black & Veatch, 913-458-3253 or [email protected]

• Tim Osborn, Field Crew Coordinator, TREKK

www.kcwaterservices.org

Design Group, 816-218-5113