LEED 2009 for Neighborhood Development SLL CREDIT 8: RESTORATION OF HABITAT OR WETLANDS AND WATER BODIES Stage 1: LEED-ND Conditional Approval
All fields and uploads are required unless otherwise noted.
ALL PROJECTS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. The project team confirms that the project does not have negative impacts on habitat for federal or state endangered species, or NatureServe GH/G1/G2/G3/S1/S2 species (see SLL Credit 7, Option 2, Part A of the rating system requirements for details). Upload SLLc8-1. The project team has uploaded a map with site base; project boundary; restoration areas by type and restoration activities; and development footprint. Upload SLLc8-1 confirms that restoration areas are not located within the project development footprint. acres
Development footprint (from PI Form 1, under Table PIf1-2): Minimum acres requiring restoration:
0
acres acres
From Upload SLLc8-1, proposed acres for restoration: Proposed acreage must meet or exceed the minimum.
Upload SLLc8-2. The project team has uploaded a description of qualifications or the resume of the biologist preparing the restoration plan; or a commitment to hire, signed and dated on owner or developer letterhead. Upload SLLc8-3. The project team has uploaded a summary of native plants used in the restoration plan; or a commitment to use native plants, signed and dated on owner or developer letterhead. Upload SLLc8-4. The project team has uploaded a commitment to prepare a land sale or easement agreement transferring restoration areas to a qualified party, signed and dated on owner or developer letterhead. Select one of the following ongoing management activity paths: SLL Credit 9 documented point Applicant-proposed management SLL Credit 9: Long-Term Conservation Management of Habitat or Wetlands and Water Bodies Stage 1 Points Documented: Document compliance with SLL Credit 9 before attempting this SLL Credit 8 path.
LEED 2009 for Neighborhood Development SLL Credit 8: Restoration of Habitat or Wetlands and Water Bodies Form Version 4.0
Page of
Upload SLLc8-5. The project team has uploaded a description of proposed management activities, including identification of responsible organizations, funding, specific restoration management activities, and duration of activities following project build-out.
ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.
SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload SLLc8-SC. The project team has provided additional documentation that supports the claim to special circumstances. (Optional)
SUMMARY SLL Credit 8: Restoration of Habitat or Wetlands and Water Bodies Stage 1 Points Documented:
of 1
Check Compliance
SLL Credit 8: Restoration of Habitat or Wetlands and Water Bodies Stage 1 Exemplary Performance Documented: The project team reserves one point in the Innovation and Design Process credit category for exemplary performance of SLL Credit 8.