LEED 2009 for Neighborhood Development GIB CREDIT

Report 3 Downloads 54 Views
LEED 2009 for Neighborhood Development GIB CREDIT 13: INFRASTRUCTURE ENERGY EFFICIENCY Stage 2: LEED-ND Pre-Certified Plan

All fields and uploads are required unless otherwise noted.

ALL PROJECTS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Select one of the following: Stage 2A. No change since Stage 1 Stage 2B. Change since Stage 1 Stage 2C. Did not submit at Stage 1

STAGE 2A No change has been made since submittals in previous stages that would affect credit compliance. of 1

GIB Credit 13: Infrastructure Energy Efficiency Stage 1 Points Documented:

STAGE 2B Provide updated versions of the items submitted at the previous stage.

STAGE 2C Table GIBc13-1. Infrastructure and Baseline Energy Estimate Infrastructure Item

Number of Items

Estimated Baseline Energy Use

+ Total

-

0

Target percent reduction in energy use:

%

Upload GIBc13-2. The project team has uploaded a commitment to meet the rating system requirements for any of the specified infrastructure items used in the project if the project is built, signed and dated on owner or developer letterhead. Describe strategies the project team expects to use to achieve the target percent reduction in energy use.

ADDITIONAL DETAILS

LEED 2009 for Neighborhood Development GIB Credit 13: Infrastructure Energy Efficiency Form Version 1.0

Copyright © 2010 U.S. Green Building Council. All Rights Reserved.

Page of

Special circumstances preclude documentation of prerequisite compliance with the submittal requirements outlined in this form.

SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload GIBc13-SC. The project team has uploaded any additional documentation that supports the claim to special circumstances. (Optional)

SUMMARY CREDIT COMPLIANCE GIB Credit 13: Infrastructure Energy Efficiency Stage 2 Points Documented: GIB Credit 13: Infrastructure Energy Efficiency Stage 1 Exemplary Performance Documented:

of 1

Check Points

N

Note: Click "Check Points" to validate that the form meets the requirements. "Check Points" must be run after any changes are made to the form to ensure that "Compliance Documented" is accurate. Always press "Check Points" before saving the form.

The project team reserves one point in the Innovation and Design Process credit category for exemplary performance of GIB Credit 13.

LEED 2009 for Neighborhood Development GIB Credit 13: Infrastructure Energy Efficiency Form Version 1.0

Copyright © 2010 U.S. Green Building Council. All Rights Reserved.

Page of