40.0m 4 0 .0 m 4 0 .0 m 4 0 .0 m 40.0m 40.0m 6 0 .0 m 60.0m ... - Gov.uk

Report 3 Downloads 296 Views
0m . 60

0m 40.

40 . 0m

5 28 8 06 04 -2 P P -D T

ng i

C

32 0A E C

-R

C E -A 0 32

-R

4 0 . 0 m

TD

m 0 . 0 6

0 00 0 + 0 12 +0 12

9+ 00 0

P P -2 40 -0 68 28 3

m 0 . 0 4

D

i ng

of M56 temporary

C or F

on t i nu at i on

R

on i at u n ti on

R

ef er t o

D

to er f e

realignment

ra w

0m . 60

w ra

C

Indicative extent

HS2 viaduct over

000 11+

0m . 60

10+0 00

Fo rC

River Bollin floodplain

HS2 crossing over existing railway

0m 40. 0m . 40

Plan Scale 1:5,000 @ A1

70

70

Brickhill Lane

Castle Mill Lane

Sunbank Lane HS2 viaduct over River Bollin floodplain - 130m

40

TP.47. 0

CH. 11721. 3

TP.46. 8

TP.48. 2

TP.48. 2

TP.45. 8

TP.43. 9

CH. 9368. 8

40

CH. 11546. 4

50

CH. 10846. 9

50

CH. 10654. 1

60

CH. 9600. 6

60

30

30

Existing railway

Mobberley Road

River Bollin

12+000

11+950

11+900

11+850

11+800

11+750

11+700

57. 4 48. 1 9. 3

56. 3 47. 9 8. 4

54. 9 47. 7 7. 2

54. 3 47. 5 6. 8

52. 5 47. 3 5. 2

49. 8 47. 1

46. 2

2. 7

46. 8 +4. 1

46. 9

46. 8 +12. 8

+0. 7

46. 8 +10. 3

42. 7

46. 9 +5. 8

34. 0

47. 0 +4. 2

36. 5

47. 1 3. 3

41. 1

47. 2 7. 9

230km/h

Design Speed:

11+650

11+600

11+550

11+500

11+450

47. 3 8. 8

50. 4

47. 4 8. 3

55. 1

56. 1

47. 5 9. 1

55. 7

47. 6 8. 5

56. 6

47. 7 7. 3

56. 1

47. 8 7. 1

55. 0

47. 9 7. 2

54. 9

48. 0 7. 2

55. 1

48. 1 6. 9

55. 2

48. 2 6. 5

55. 0

48. 3 5. 8

54. 7

48. 3 4. 8

54. 1

48. 3 3. 3

53. 1

48. 2 2. 3

51. 6

48. 1 1. 3

50. 5

48. 0 0. 9

49. 4

47. 9 0. 7

48. 9

47. 8 0. 5

48. 6

47. 7 0. 3

48. 3

48. 0

47. 5 +0. 2

47. 3

47. 4 0. 1

47. 5

47. 4

46. 8

R=30000.0

47. 3

47. 1 +0. 8

R=45300.0

5 . 2 9 8 1 = L % 3 8 3 . 0 G=

L=174.9

0. 1

47. 0 +1. 2

L = 6 9 9 . 6 G= 0 . 2 0 0 %

L=192.7

47. 2

46. 9 +1. 7

L=1025.5

+0. 4

46. 7 +2. 2

46. 3

46. 6 +2. 6

45. 8

46. 5 +2. 8

45. 2

46. 4 +3. 9

44. 5

46. 3 +4. 9

44. 0

46. 2 +6. 2

43. 7

46. 1 +6. 6

42. 5

46. 0 +7. 2

41. 4

45. 8 +7. 7

40. 0

45. 7 +7. 8

39. 5

38. 8

45. 3 +7. 2

38. 1

44. 9 +7. 3

37. 9

44. 3 +7. 2

38. 1

43. 6 +6. 6

37. 6

42. 9 +5. 8

11460. 8

11+400

11+350

11+300

11+250

11+200

11+150

11+100

11+050

11+000

10+950

10+900

10+850

10+800

10+750

10+700

10+650

10+600

10+550

10+500

10+450

10+400

10+350

10+300

10+250

10+200

10+150

10+100

10+050

10+000

9+950

9+900

9+850

9+800

9+750

9+700

9+650

9+600

9+550

9+500

9+450

9+400 37. 1

42. 1 +4. 9

37. 0

37. 1

37. 2

41. 4 +3. 9

37. 5

37. 9 40. 6 +2. 7

38. 3 39. 9 +1. 6

38. 1 39. 2

38. 0

+1. 1

Cut and Fill

R=18500.0

R=-2125.0

L=30.0

5 . 3 5 0 1 = L % 5 2 2 . 0 G=

L=231.8

38. 4

Proposed Level

L=2114.0

+0. 4

Existing Level

R=-2325.0

0 . 0 6 5 = L % 8 7 4 . 1 G=

Vertical Alignment

11430. 8

L = 2 9 5 . 0

42. 8

L=2295.4

Horizontal Alignment

9+350

9+300

9+250

9+200

9316. 8

9021. 8

Chainage

9+150

10

9+100

10

9+050

20

9+000

20

220km/h

Profile 0

50

100

200

500

METRES @ 1:5000

0

5

10

20

Scale H:1:5,000 V:1:500 @ A1

50

METRES @ 1:500

Updated for acceptance

KB

TO

JG

P02

First Issue

11/07/17

11/07/17

11/07/17

KB

TO

JG

15/06/17

Legends/Notes:

the reproduction of this document after alteration, amendment or abbreviation

Key Environmental Features Legend

or if it is issued in part or issued incompletely in any way.

© Crown Copyright and database right 2017. All rights reserved.

P01 15/06/17

HS2 accepts no responsibility for any circumstances which arise from

Ordnance Survey Licence number 100049190

15/06/17

© Crown Copyright material is reproduced with the permission of Land Registry under delegated authority from the Controller of HMSO.

Legend

World Heritage Site

Scheduled Monuments

Track Centrelines

Ramsar

Registered Parks and Gardens

Viaduct

Special Areas of Conservation

Historical Battlefields

Tunnel

Special Protection Areas

Active and/or Authorised Landfill

Existing Railway Connection

SSSI

Historical Landfill

HS2 Connection

Flood Zones

Fully Retained Cutting/Fill Major Contour

National Nature Reserves This material was last updated on 2017 and may not be copied, distributed,

Area of Outstanding Natural

sold or published without the formal permission of Land Registry. Only an official copy of a title plan or register obtained from the Land Registry

Beauty

may be used for legal or other official purposes.

National Park Major Development Sites Additional Development Sites

10

Listed Building Grade I

Registered in England Registration No. 06791686 Registered office: 2 Snow Hill, Queensway, Birmingham, B4 6GA

Engineering Earthworks Railway Cutting

Description

Drawn

Checked

Con App

HS2 App

Scale with caution as distortion can occur.

Manchester Metropolitan Spur Design Stage

West Midlands to Manchester Route Discipline/Function

Post-Consultation Drawing Title

Railway Track Drawn

Checked

KB

Railway Embankment

Ground Profile

Date

Listed Building Grade II*

Track Profile

Listed Building Grade II

Minor Contour

HS2 Depot/Station

Node

Operational Boundary

Approved

TO

JG

2017 Preferred Route - HSM28B Plan and Profile Creator/Originator

Sheet 2 of 7 AECOM

Rev

Project/Contract

Zone

Scale

15/06/2017

AS SHOWN

Drawing No.

C320-AEC-RT-DPP-240-068284

Size

A1 Rev.

P02