Main Street Rehabilitation Project SURVEY - CONSTRUCTION SCHEDULING The City of Placerville greatly values your input to help us to determine the most effective manner to schedule construction of the water, sewer, roadway, and related improvements that are part of the Main Street Rehabilitation project. This survey will help the City determine a construction schedule that minimizes impacts/disruption experienced by customers, business owners, and the community.

Question 1: Setting aside seasonal considerations please SHADE your preferred blocks of time for construction of improvements. In order to be meaningful please shade a minimum of 10 blocks. Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

12 midnight – 8 a.m. 8 a.m. – 6:00 p.m. 6 p.m. - midnight Comments ______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________________

Question 2: On a scale of 1 (least preferred) to 10 (most preferred), please indicate your feeling about construction in each month. Provide a rating for each month. In order to be meaningful, please rank at least 3 months as ‘higher’ in order of preference. Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Rating 1 (low) to 10 (high)

Comments ___________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________

Dec

Question 3: TRADE-OFFS. It appears that the cross walk, sidewalk, roadway paving and sewer rehabilitation work can be accomplished relatively quickly. However repairing and replacing the water line is necessary but will require a significant effort. To some extent, the water line replacement work can be accomplished in an expedited fashion, but with significant impediment to parking and traffic on Main Street, and by extension to businesses. Conversely, the waterline work could be planned to occur over a longer duration, with significantly less impact, but a ‘construction zone’ feel throughout. It is also likely that requiring a contractor to comply with either a required ‘fast track’ or a ‘minimal impact’ approach will increase the project cost. Given these assumptions… 3A. Would you prefer the shortest duration but greatest impact, the longest duration with the least direct impact, or a balanced approach? 

Shortest duration but greatest impact



Longest duration with the least direct impact



Balanced approach

Comments____________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________ 3B. In order to accomplish your ideal construction schedule (question 3A above) would you support the City paying a higher overall price for equivalent work? 

Yes



No



Perhaps (please explain) ____________________________________________________________________________________________ ________________________________________________________________________________________________________________

 Individual  Business  Both

Individual/Business Name:

Phone #:

Email Address:

Signature _____________________________

Date __________